Fats Rollini Jazz & Blues Band will be playing live at Pinner Memorial Park on Sunday 5th August @2:30pm.
Do bring your chairs and picnic as there will be limited chairs for hire.
The weather is looking a bit better this Sunday!
The Pinner Association
– The Voice of our Community
Fats Rollini Jazz & Blues Band will be playing live at Pinner Memorial Park on Sunday 5th August @2:30pm.
Do bring your chairs and picnic as there will be limited chairs for hire.
The weather is looking a bit better this Sunday!
The Boundary Commission are starting of a 10-week public consultation on proposals for new council wards and ward boundaries for the London Borough of Harrow.
What is an electoral review?
Our electoral review will recommend new electoral arrangements for Harrow. We will propose:
Click on the link below
https://consultation.lgbce.org.uk/node/13739
Our consultation will close on 8 October 2018.
After we have considered all representations made to us during this consultation, we intend to publish draft recommendations in January 2019.
We will then hold a further period of consultation on our draft recommendations. Our final recommendations are expected to be published in May 2019.
The new electoral arrangements will come into effect at the local elections in May 2022.
Despite the “wrong type of weather”. Those that ventured forth into Pinner Memorial Park were treated to some wonderful music by the Whitmore School Steel Band.
The talented players bought a ray of sunshine to the park, and we were royally entertained.
Thank you to the resilient audience for coming and sitting in the rain. Hopefully the weather will be better for Fats Rollini Jazz & Blues Band next week.
See you there next Sunday.
Marsh Road, Pinner, Harrow
30 July — 02 August
Delays likely Traffic control (multi-way signals)
Works location: J/W WEST END LANE
Works description: SEW DESCALE EMERGENCY/REACTIVE…
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU026008107PPCS—000002
Marsh Road, Pinner, Harrow
30 July — 02 August
Delays likely Traffic control (multi-way signals)
Works location: J/W HIGH STREET
Works description: SEWER CLEANING – REACTIVE…
Responsibility for works: THAMES WATER
Current status: Planned work about to start
Works reference: MU026008107PRYY–000002
West End Lane, Pinner, Harrow
31 July — 03 August
Delays possible Traffic control (two-way signals)
Works location: 69, WEST END LANE, , PINNER, LONDON BOROUGH OF HA…
Works description: COMMUNICATION PIPE – INSTALL ; 63 P-LINE; 3″ CI; 1 OF 1 – FW/CW WORKS – FW CLOSURE REQUIRED – PEDS T…
Responsibility for works: Affinity Water
Current status: Planned work about to start
What ever the weather throws at us. Come on down to listen to the Whitmore School Steel Band. See you there come rain, wind or sunshine.
We have received the following notification from Harrow Council
On Thursday 26th July filming will take place on the High Street, Pinner between 7 pm and 10 pm. A film crew will be filming a car positioned on a low loader vehicle travelling up the High Street towards Paines Lane as part of a Vauxhall car commercial.
In the interests of safety and to facilitate the filming, the Council have approved the use of Traffic Diversions during the filming period to prevent cars from travelling along the High Street. Diversionary route signage will be in place to divert traffic around the High Street.
Stop / Go points will be positioned at the following locations; at the junction of Bridge Street and the High Street, Grange Gardens, Church Lane and Paines Lane and at the junction of Paines Close. The film crew have been authorised to hold traffic for a maximum of 5 minutes only between 7 pm – 10 pm to allow the filming sequence to take place. Compliance with the 5 minute holds will be closely monitored by a member of Harrow Council’s Highways department.
Under Traffic Order, all bays along the High Street have been suspended between the hours of 12:00 and 23:00 on the 26th July. As an alternative the public are advised to use the pay and display car park at Chapel Lane. To reduce the inconvenience the film company have agreed to support any disabled car user wishing to use the disabled bays along the High Street and filming marshals will be on site from 11 am on the day to support this.
Finally, a row of 12 bays has also been suspended for filming use only in Waxwell Lane car park all day on Thursday. The rest of the car park is available for public use.
We apologise in advance for any inconvenience this may cause you.
Kind regards
Harrow Film Office, Harrow Council
Sunday 29th July at 2:30pm.
We are delighted to have Whitmore High School Steel Band start this seasons “Summer Band Concerts”.
Don’t forget to pack a picnic & bring a chair as only a limited number of chairs will be for hire.
At the moment the weather is looking good.
See you there!
22 July — 23 July |
Delays possible Traffic control (two-way signals) |
Works location: opposite exit from west house car park… |
Works description: SECTION 81- To reset surface box in Carriageway… |
Responsibility for works: Cadent |
Current status: Planned work about to start |
Works reference: AZ007166733NL |
Maybe at the third attempt – this will actually happen this time!
17 July — 21 July |
Delays possible Traffic control (two-way signals) |
Works location: LAY 2X NEW DOMESTIC SERVICE 12M FROM 125MM PE MAIN INNEARSIDECARRIAGEWAY… |
Works description: COVERING FLAT 2 AND FLAT 3 WAXWELL LANE PINNER HARROW HA5 3EN… |
Responsibility for works: Cadent |
Current status: Planned work about to start |
Works reference: AZ0071000736606 |
From The Pinner Association’s Response to the Second Public Consultation on the Proposals to Build Additional Housing on the Grove Estate Pinner:
Comparing the proposals presented at the second public consultation, in June 2018, with those presented at the first consultation, it is difficult to reconcile the plans presented on the second consultation display boards with the indicative plans displayed at the first consultation.
In particular, the feedback that: “You Raised Concern With: • Height and Mass of Proposed Buildings • Loss of Trees” does not seem to have been addressed in planning the proposed development. The proposed footprints of the new buildings have been increased significantly from those outlined in the first consultation, with a concomitant greater proposed loss of mature trees. For both the “South Site” and “East Site” the existing trees on the boundary of and within the Grove Estate form an important role in screening the existing flats, to the benefit of both the residents of the flats and those residents with properties adjacent to the Grove Estate or to users of Pinner Village Gardens. Many of these trees would be lost if the development was to go ahead as currently proposed.
South Site: The orientation of the proposed town houses would result in actual overlooking of the private rear gardens of properties in Hereford Gardens and Cannon Lane. This unacceptable intrusion into the private amenity space of the existing dwellings has been recognised by the proposal for the design of these new houses to include: “South facing elevation – designed to mitigate overlooking issues by diffusing views from windows through the use of fins or louvers”.
The proposed seven townhouses would intrude into the area currently occupied by mature trees, as well as using the area currently occupied by garages, hard standing and storage buildings. This is not what was shown on the indicative plan displayed at the first public consultation, where only the previously developed area was shown to be built upon.
If, despite the problem of building homes that would directly overlook rear gardens, it was to be decided to build town houses on the orientation shown, then all should be of the three bedroomed, mono-pitched roof, design with small obscured glass windows serving only non-habitable rooms such as bathrooms on the south elevation. These would then effectively be one storey on the side backing onto existing properties in Hereford Gardens / Cannon Lane to mitigate the already identified overlooking issues.
Fewer townhouses should be built so as to allow the existing screening trees to remain in situ, i.e. building should be restricted to the footprint of the existing developed area. The proposed design does not address the concerns raised at the first public consultation about the height and mass of the proposed new buildings, nor the concern about the loss of mature trees from the Grove Estate.
East Site: The proposal for a six storey block immediately adjacent to and visible from Pinner Village Gardens would be greatly detrimental to the amenity value of that park, whether of the design proposed in Scheme 1 or Scheme 2. If it is deemed absolutely imperative to build a large block of flats on the site, the design should be restricted to a maximum of four storeys to respect the current height of the buildings on the estate. This would have the concomitant effect of allowing the new building to be constructed further from the eastern boundary of the Grove Estate, as not so much separation from the existing flats building would be required to allow sufficient light to reach the existing flats. As shown, both schemes would result in a very large, tall building being sited immediately adjacent to the boundary with Pinner Village Gardens.